A handover order, you must be able to retrieve the original work order
The squad leader fetches the handover field from the work order or point meter on the duty. A message is processed on a work order, and the other column is the number of completed, pending processing and pending judgments. Different batches of the same material number should be recorded separately, and the item number, batch number and work order number should be kept as they are. When encountering "two boxes" and other units, the quantity of each box should be specified according to the actual label, and the common packaging volume cannot be guessed.
| Fence | How to fill in | where to check from |
|---|---|---|
| Worker | Work order, item number, batch number, location | On-time work order and material label |
| Amount | Completed, to be processed, to be determined in the number and units of each column | Point material table or official production record |
| outstanding matters | The reason for the difference, the current treatment, whether it can continue | Existing qualities or exceptions |
| successor | Takeover and the next confirmation time | Schedule and on-site process |
From the sentence "12 left" to the explanation that can be taken over
The exercise template, the number and the information are all indications.
Handover work order WO-017, item number P-104, batch number L-03. The 28 piece has been completed, the 12 piece has been received at the point, and it is located at B-02. The successor 15:30 checks the quantity according to the point material meter, please return the squad leader if there is a difference.
Ask the successor to recount the results of his verification, such as "I will receive p-104, l- at the point 15:30 to b-02 03 12 pieces." If you see the 12 group instead of 12 For documents, first check the label and work order, and then correct it by the issuer. The correction information should be accompanied by the work order number and correction field, so that the next class knows which one to use.
Who are the materials, quality and equipment abnormalities?
- Inconsistent material quantity or label. Return the warehouse management or squad leader. Record the expected value and point receipt value, and wait for the designated personnel to check and then update the shift order.
- Batches to be judged by quality control. According to the process in the factory, hand it over to the quality control, and bring the batch number and disposal status when handing over the shift. The "seeing" in the translation cannot be regarded as approved release.
- Involved equipment safety or personnel danger. Immediately use the in-plant official notification and on-site procedures. The LINE group can supplement the confirmed handover information, and the emergency processing should be in accordance with the instructions of the on-site personnel with the responsibility.
Avoid using the same "Okay" to indicate received, clicked or released. The succession table can be divided into three columns to be taken over, reviewed, and closed, and the record of the actual judge is retained.
Exercise with two fake work orders
-
Distinguish similar numbers
Use P-104 and p-140 to indicate the material number to check whether the successor can point out the correct location and material.
-
change a number
Change the number of pending receipts in one of the strokes, and ask the successor to point out which version is effective and why the old quantity cannot be used.
-
leave artificial results
The squad leader will check the work order number, material number and unit, and who has been confirmed to register on the shift form. WanyuTong can assist in text translation, and the group language settings can be set from
@選單Turn on. Work approval is still done by people.
Template and usage restrictions
WanyuTong team at 2026 - 11 - 19 write this version of the work guide. The diagram and drill provide the steps of the reader's own self-checking, and the personnel, codes and numbers in the text are shown. The actual translation results will be affected by the words, abbreviations and context, and the team should be subject to the original data and on-site confirmation.
The product entry of this article is based onFirst use of teachingCheck. The notification, reply and confirmation list is maintained by the user team. See the source and version labeling methodContent Editing and Testing Principles。